Table of Contents

Frequently Asked Questions

What does activity code 7110.78 authorise in Dubai

Activity code 7110.78 authorises consultancy and engineering services related to drilling operations, stock management within production environments, and production engineering support. It sits within ISIC Division 71 — Architectural and Engineering Activities; Technical Testing and Analysis — as classified by the UAE's ISIC framework and the Dubai Department of Economy and Tourism (DET) activity directory.

The licence applies across oil & gas, petrochemical, water well drilling, and industrial manufacturing sectors. It is a professional services and consultancy activity, meaning it covers technical advisory, design, and engineering management rather than the physical execution of drilling operations on-site.

What types of services are permitted under the Drilling, Stock & Production Engineering Services licence

Holders of this licence are authorised to provide a range of technical and advisory services, including:

  • Engineering design and technical advisory for drilling programmes
  • Production optimisation studies and stock or inventory engineering
  • Well integrity assessments, production flow analysis, and field development planning
  • Subcontracting oversight and project management for upstream engineering scopes

The licence does not cover the physical execution of drilling work on-site. Firms requiring hands-on contracting activities would need a separate or supplementary contracting licence.

Who is the Drilling, Stock & Production Engineering Services licence best suited for

This licence is designed for a specific but commercially active group of professionals. Petroleum engineers, drilling consultants, and production technologists working independently or building a boutique firm will find it the most direct route to formal commercial status in Dubai.

International EPC companies establishing a UAE presence to service GCC upstream projects frequently use this activity code as their primary or supplementary licence. Engineering firms diversifying from adjacent sectors — civil, mechanical, or process engineering — also use it to formalise their oilfield services offering. Freelance technical specialists benefit from the corporate entity structure it provides, enabling direct contracting with national oil companies (NOCs) and international oil companies (IOCs).

Can a foreign national own 100% of a company holding this licence in Dubai

Yes. 100% foreign ownership is available for this licence type in both free zones and mainland Dubai. The mainland ownership reform, introduced post-2021, removed the previous requirement for a local Emirati partner for most professional and commercial activities, including engineering consultancy activities like 7110.78.

Free zones such as Meydan Free Zone have always permitted full foreign ownership and continue to be a popular choice for international consultancies due to their streamlined incorporation process and flexible structures.

What is the difference between setting up in a free zone versus mainland Dubai for this licence

Free zone incorporation (e.g., Meydan Free Zone) offers 100% foreign ownership, faster setup timelines of approximately 5–10 working days, and no statutory audit requirement for smaller consultancies. It is well-suited to firms primarily serving international or regional clients rather than UAE federal government entities.

Mainland Dubai, regulated by the Dubai Department of Economy and Tourism (DET), is the preferred choice for firms that need to contract directly with UAE federal government entities or local authorities. The setup timeline is longer, typically 2–4 weeks, but the jurisdiction offers broader access to government and semi-government procurement opportunities.

How long does it take to set up a Drilling, Stock & Production Engineering Services company in Dubai

Setup timelines vary by jurisdiction. A free zone licence can typically be established within 5–10 working days, making it the faster route for consultancies that want to begin operations quickly. Mainland Dubai incorporation through the DET generally takes 2–4 weeks, accounting for additional regulatory steps and approvals.

The overall timeline can be influenced by factors such as trade name availability, document preparation, and the complexity of the business structure chosen.

Which clients and markets can a Dubai-licensed engineering consultancy under 7110.78 target

A Dubai-based entity holding this licence is well-positioned to engage with a broad range of clients across the region. Key target markets include oil & gas operators, industrial manufacturers, and EPC contractors operating in the GCC and wider Middle East.

Dubai's role as a regional hub means that a single licence here can support engagement with major operators such as ADNOC, ENOC, and Dubai Petroleum concession holders, without necessarily requiring a separate legal entity in each country where work is performed. This makes it a commercially efficient structure for firms targeting multiple GCC markets.

What is the first step in the licence setup process for this activity

The first step is to choose your jurisdiction — either a free zone or mainland Dubai. This decision should be based primarily on your intended client base and contracting requirements. Free zones are generally preferred for international-facing consultancies, while mainland registration suits those targeting UAE government or local authority contracts.

Once the jurisdiction is selected, the next step is to reserve a trade name that is aligned with your engineering activity. Names should be specific enough to reflect the professional nature of the business and must comply with the naming conventions of the chosen jurisdiction's regulatory authority.

Drilling, Stock & Production Engineering Services License in Dubai

Somebody designs the well before anyone drills it, and somebody works out why a mature field is producing less than it should. That engineering layer is a business in its own right, and Dubai is where a lot of it is based.

Activity code 7110.78 is the license for it. The single most important thing to understand is what it does not cover: you advise, design and manage, but you do not physically drill. This guide covers the scope, who holds it, and how to set up.

Key Stats at a Glance

Activity code7110.78
Activity nameDrilling, Stock & Production Engineering Services
ISIC division71, architectural and engineering activities, technical testing and analysis
License typeProfessional or commercial
What it does not coverPhysical drilling execution on site, which needs a separate contracting license
Sectors servedOil and gas, petrochemical, water well drilling and industrial manufacturing
Ownership100% foreign ownership, free zone and mainland since the 2021 reforms
Time to license5 to 10 working days in a free zone, 2 to 4 weeks on the mainland
VisasTypically 1 to 6 under the initial license, depending on office tier
Infographic: Drilling, Stock & Production Engineering Services License in Dubai

What This License Covers

Code 7110.78 sits in ISIC Division 71. It allows consultancy and engineering services covering drilling operations, stock management inside production environments, and production engineering support.

What you can sell

  • Engineering design and technical advice for drilling programmes
  • Production optimisation studies, and stock or inventory engineering
  • Well integrity assessments, production flow analysis and field development planning
  • Subcontracting oversight and project management for upstream engineering scopes

Where the line sits

This is a professional services and consultancy activity. It covers the technical advisory, design and engineering management layer that sits above drilling work. It does not authorise you to execute that work on site. A firm that wants hands-on contracting as well needs a separate or supplementary contracting license, so decide early which side of the line your business sits on.

Who Your Clients Will Be

The buyers are the operators and the contractors building for them:

  • Oil and gas operators, both national and international
  • Industrial manufacturers
  • EPC contractors working across the region

Dubai's position as a regional base matters commercially here. A license held in Dubai lets you engage operators such as ADNOC, ENOC and Dubai Petroleum concession holders without needing a separate legal entity in every country where the work is actually performed. For a consultancy running project pipelines across several markets, that is the difference between one entity and five.

Who Should Hold This License

Four groups use this code most:

  • Petroleum engineers, drilling consultants and production technologists working independently or building a boutique firm
  • International EPC companies opening a UAE presence to service GCC upstream projects
  • Engineering firms diversifying from civil, mechanical or process engineering into oilfield services
  • Freelance technical specialists who need a corporate entity to contract directly with national and international oil companies

That last group is worth calling out. Plenty of capable specialists lose work simply because an operator cannot contract with an individual. The license solves that.

Mainland or Free Zone

FactorMainland (DET)Free Zone (Meydan Free Zone)
Best fitFirms that work directly with UAE federal government entities or local authoritiesConsultancies serving international and regional clients
Ownership100% since the 2021 reforms100%, as it always has been
Time to license2 to 4 weeks5 to 10 working days
AuditStandard mainland rulesNo statutory audit for smaller consultancies
InvoicingStandardCan invoice international clients in foreign currency

Pick on the basis of who you will be working with. Mainland through the Department of Economy and Tourism opens up government and semi-government procurement, which is worth the longer timeline if that is the target.

A free zone license is faster, carries no statutory audit for a smaller consultancy, and lets you invoice international clients in foreign currency. For a firm whose project revenues arrive in dollars, euros or pounds, that last point is a practical advantage rather than a technicality.

[blockCTACostCalculator]

What You Need to Apply

  • Passport copies for all shareholders and managers
  • Proof of professional qualifications, meaning your engineering degree and relevant certifications
  • A business plan or activity description, which some free zones ask for
  • A No Objection Certificate if you are on a UAE residence visa sponsored by another company

Step by Step Setup Guide

  • Step 1, pick your jurisdiction: Base it on your client list and who you need to sign contracts with, rather than on cost alone.
  • Step 2, book your trade name: Choose something that reflects the engineering work. Avoid generic terms that clash with regulated professional categories or with companies already registered.
  • Step 3, submit your application: File activity code 7110.78 with your supporting documents. A free zone license usually issues in 5 to 7 working days. The mainland route may want your professional qualifications attested, depending on the scope you declare.
  • Step 4, register where it counts: If you intend to bid for ADNOC or federal government work, get onto the relevant vendor portals and consider engaging with the professional bodies that validate engineering credentials in the UAE.
  • Step 5, sort your visas: You can typically sponsor 1 to 6 visas under the initial license, depending on your office tier and jurisdiction.

Compliance and What You Need in Place

Stay on the advisory side of the line

The scope boundary is the main compliance point for this code. Advisory, design and engineering management are covered. Physical execution is not. If a client asks you to take on site work, that is a licensing question before it is a commercial one.

Qualifications matter here

Unlike most service codes, this one turns on credentials. Proof of engineering qualifications forms part of the application, and the mainland route may want them attested. Operators will ask for them too.

Vendor prequalification

Getting the license is not the same as being able to bid. Major operators run their own vendor registration, and that is a separate process with its own timeline. Start it early rather than discovering it when a tender is already open.

Audit and reporting

Smaller free zone consultancies avoid a statutory audit, which keeps overheads down in the early years. Confirm where the threshold sits for your structure rather than assuming it will always apply.

Market Opportunity

The commercial case rests on scale of investment. ADNOC's Strategy 2030 targets UAE oil production capacity of 5 million barrels per day by 2027. Investment on that scale generates long-cycle demand for engineering work at every stage, from well design through production optimisation to brownfield intervention.

Dubai's role adds to that. It functions as the regional headquarters base for oilfield services firms covering GCC operations, Iraq, North Africa and East Africa, so a company incorporated here can manage multi-country project pipelines from one credible, well-regulated base. The Ministry of Energy and Infrastructure continues to publish frameworks supporting private sector participation in the energy services supply chain.

There is also a quieter driver worth understanding. As fields across the region mature, they need more technical intervention to hold output steady. That means demand for production engineering expertise grows as assets age, which is the opposite of what most people assume about a maturing basin. The work does not dry up. It changes character.

Conclusion

Code 7110.78 is a well-defined professional license that puts engineering firms and independent consultants formally into Dubai's energy and industrial services market.

Setup is simple, full foreign ownership is available in both jurisdictions, and the pipeline behind it is driven by sustained regional upstream investment rather than short-term cycles.

Whether you are a solo drilling consultant or an established EPC firm opening a regional office, the license gives you the legal footing to engage the market directly. Just be clear from the outset that it covers the engineering, not the drilling.

[blockCTAContact]

References

On-Demand Video
Live Chat
Call Us
WhatsApp