Table of Contents

Frequently Asked Questions

What does activity code 7110.93 cover in Dubai

Activity code 7110.93 — Fire Safety & Protection Engineering Services — falls under ISIC Division 71, which covers architectural, engineering, and related technical consultancy. It is an engineering consultancy activity, not a trading or installation contracting licence.

The scope includes fire suppression system design, fire alarm system engineering, hazard and risk assessments, evacuation planning, emergency response strategy, and fire safety compliance consulting and audit services.

If you are supplying equipment or carrying out physical installation, you will need separate trading or contracting licences in addition to this activity code. The distinction between consultancy and contracting is strictly observed by the Official UAE Government Portal.

Who needs a Fire Safety & Protection Engineering Services licence in Dubai

Any firm providing fire safety design, engineering consultancy, or compliance advisory services to clients in Dubai requires this licence. Clients span the full development and asset management spectrum, including property developers, main contractors, facilities management firms, government entities, and industrial operators.

The requirement is driven by the UAE Fire & Life Safety Code of Practice, which mandates fire safety compliance for all commercial, residential, and industrial structures. Dubai Civil Defence administers and enforces this code across every asset class.

Given over AED 300 billion in active construction projects in Dubai as of 2024, the demand for licensed fire safety engineering consultants is structural rather than niche.

Is 100% foreign ownership allowed for this licence

Yes. 100% foreign ownership is permitted under a mainland DED licence for engineering consultancy activities, including activity code 7110.93. This reflects the UAE's broader liberalisation of professional and technical service sectors.

Ownership structure still affects other considerations such as liability exposure and visa quotas, so confirming your legal structure — typically an LLC or sole establishment — before proceeding is strongly recommended.

What is the Dubai Civil Defence NOC and why is it required

The Dubai Civil Defence No Objection Certificate (NOC) is a mandatory external approval required for firms operating under activity code 7110.93. It is independent of the DED licensing process and cannot be bypassed or substituted.

In addition to the NOC, your firm must be registered on Dubai Civil Defence's approved consultant list. Without this registration, you cannot legally engage on civil defence projects or provide fire safety compliance consultancy in Dubai.

This step is described as the critical external approval in the licensing process and should be planned for from the outset, as it adds time and documentation requirements beyond the standard DED workflow.

Can this licence be registered in a free zone instead of mainland Dubai

Free zone registration is viable for consultancy-only business models with primarily international client bases. However, it carries restrictions on direct civil defence project engagement, which limits access to a significant portion of the Dubai market.

A mainland Dubai (DED) licence is the preferred jurisdiction for firms targeting government tenders, civil defence projects, and broad UAE market access. If your growth strategy involves local government or infrastructure clients, mainland registration is the more practical choice.

What are the key steps to obtain a Fire Safety & Protection Engineering Services licence

The process involves multiple external approvals beyond the standard DED workflow. The main steps are: choosing your jurisdiction (mainland DED or free zone), reserving a trade name and selecting a legal structure, and submitting initial approval through the Dubai Department of Economy and Tourism eServices portal.

Following initial approval, you must obtain the Dubai Civil Defence NOC and secure registration on their approved consultant list. You must also secure a physical office space with an Ejari-registered tenancy contract — virtual office arrangements are not accepted for this activity category.

Planning for the Civil Defence approval stage early is essential, as it is independent of the DED process and can affect overall timeline significantly.

Are virtual offices acceptable for this licence

No. Virtual office arrangements are explicitly not accepted for activity code 7110.93. A physical office space with an Ejari-registered tenancy contract is mandatory.

The office address must be verifiable and compliant with DED requirements. This is an important cost and logistics consideration when planning your setup, particularly for overseas investors entering the Dubai market for the first time.

What is the market opportunity for fire safety engineering services in Dubai

The UAE fire protection market is projected to grow at a CAGR of approximately 6.5% through 2028, according to IMARC Group. This growth is underpinned by a regulatory environment that makes fire safety compliance a legal requirement across all commercial, residential, and industrial structures.

With over AED 300 billion in active construction projects in Dubai as of 2024, the pipeline of work requiring fire safety engineering input is substantial and sustained. Clients include property developers, main contractors, facilities management companies, and government entities — all subject to the UAE Fire & Life Safety Code of Practice.

Because compliance is mandated rather than optional, demand for licensed fire safety engineering consultants is tied directly to construction and asset management activity rather than discretionary spending cycles.

Fire Safety & Protection Engineering Services License in Dubai

Somebody designs the sprinkler layout and the alarm system before a building goes up. In Dubai that design has to satisfy Civil Defence, and Civil Defence decides who is allowed to produce it.

Activity code 7110.93 licenses that engineering work. The trade license is only half of it: without a Civil Defence No Objection Certificate and a place on their approved consultant list, you cannot work. This guide covers the scope, both approvals, and the credentials behind them.

Key Stats at a Glance

Activity code7110.93
ISIC division71, architectural and engineering activities
License typeEngineering consultancy, not trading or installation contracting
Mandatory external approvalDubai Civil Defence NOC, plus registration on their approved consultant list
PremisesPhysical office with Ejari-registered tenancy. Virtual offices are not accepted
Engineer credentialsNFPA, IFE or equivalent, attested for UAE practice
Ownership100% foreign ownership under a mainland license for engineering consultancy
Time to license3 to 6 weeks from initial approval, subject to the Civil Defence queue
Market growthUAE fire protection market projected to grow around 6.5% a year through 2028 – IMARC Group
Infographic: Fire Safety & Protection Engineering Services License in Dubai

What This License Covers

Code 7110.93 sits in ISIC Division 71 as an engineering consultancy activity. The scope is:

  • Fire suppression system design and engineering
  • Fire alarm system engineering and specification
  • Hazard and risk assessments for commercial, industrial and residential assets
  • Evacuation planning and emergency response strategy
  • Fire safety compliance consulting and audit services

Design, not supply or installation

If you are designing fire systems and advising on compliance, this is your code. If you are supplying equipment or physically installing it, you need separate trading or contracting licenses alongside this activity. The line between consultancy and contracting is strictly observed here, so establish which side you are on before you apply.

Who Your Clients Will Be

  • Property developers
  • Main contractors
  • Facilities management firms
  • Government entities
  • Industrial operators

All of them fall under the UAE Fire and Life Safety Code of Practice, which Dubai Civil Defence administers and enforces across every asset class. Nobody in that list is buying your work because they want to, which is what makes the demand dependable.

The Civil Defence Approval

This is the part that separates 7110.93 from an ordinary engineering license, and it is worth understanding before anything else.

The NOC

Dubai Civil Defence must issue a No Objection Certificate. It is independent of the licensing process and cannot be bypassed or substituted.

The approved consultant list

Your firm must also be registered on it. Without that registration you cannot legally engage on civil defence projects or provide fire safety compliance consultancy in Dubai.

Your engineers

The license holder has to show technical competency to Civil Defence. Engineers need recognised credentials such as NFPA or IFE, attested for UAE practice, and Civil Defence will not accept unattested or expired qualifications.

Plan for all three from the outset. Civil Defence processing times vary and sit outside the licensing authority's control, which means they, not DET, usually determine when you can start earning.

Mainland or Free Zone

FactorMainland (DET)Free Zone (Meydan Free Zone)
Civil Defence projectsDirect engagementRestricted, and may need further approvals or a mainland presence
Government tendersEligibleNot direct
Ownership100%, with no local service agent for engineering consultancy100% yours
PremisesEjari-registered physical officeLower entry cost, but the office rule still applies to this activity
Best fitGovernment tenders, civil defence projects, broad UAE accessConsultancy-only models with international clients

Mainland is the preferred jurisdiction for firms targeting government tenders, civil defence projects and broad UAE market access. Full foreign ownership applies to engineering consultancy with no local service agent, so the old reason for avoiding mainland no longer holds.

A free zone suits a consultancy-only model serving international clients, with lower entry costs and simpler setup. The constraint is real though: direct engagement on Civil Defence-regulated projects inside the UAE may need extra approvals or a mainland presence, and that is most of the local market.

The cost difference is real. Free zone packages cost less to enter, mainland costs more to set up and renew but delivers broader access and eligibility for government procurement. Weigh that against where your work will actually come from.

[blockCTACostCalculator]

Step by Step Setup Guide

  • Step 1, choose your jurisdiction: Mainland for government tenders and civil defence work, free zone for consultancy-only models with international clients.
  • Step 2, book your trade name and pick your structure: Most operators use an LLC or a sole establishment. The structure affects ownership split, liability and visa quotas.
  • Step 3, submit for initial approval: Through the DET portal. This confirms the activity is permissible under your proposed structure before you commit to premises or further spend.
  • Step 4, get your Civil Defence NOC: The critical external approval, plus registration on the approved consultant list. Non-negotiable and independent of the licensing process.
  • Step 5, secure a physical office: An Ejari-registered tenancy is compulsory. Virtual offices are not accepted for this activity, and the address must be verifiable.
  • Step 6, engage a qualified engineer: With NFPA, IFE or equivalent credentials, attested for UAE practice.
  • Step 7, submit everything and pay: Memorandum of Association, tenancy contract, engineer qualification certificates and Civil Defence approval.
  • Step 8, collect your license: Typically 3 to 6 weeks from initial approval, depending on the Civil Defence queue.

Compliance and What You Need in Place

Two renewals, tracked separately

Your trade license renews annually and your Civil Defence registration renews annually, independently of each other. Missing either creates compliance problems on active projects, so track both rather than assuming one reminder covers you.

Keeping credentials current

Engineer qualifications must stay attested and in date. This is not a one-off setup task, and a lapsed credential can stall submissions that clients are waiting on.

VAT

Registration is compulsory once taxable turnover passes AED 375,000.

Employment

Contracts must be registered with MOHRE, and Emiratisation quotas apply once headcount reaches the relevant thresholds.

Market Opportunity

The demand fundamentals here are structural rather than cyclical, because compliance is mandated across every asset class rather than chosen.

The pipeline

Dubai had over AED 300 billion in active construction projects as of 2024, and the Dubai 2040 Urban Master Plan, Expo City legacy development and a continuing pipeline across hospitality, logistics and mixed-use assets all need fire safety engineering from concept through handover and beyond. IMARC Group puts the UAE fire protection market on roughly 6.5% annual growth through 2028 on the back of that enforcement.

The economics

The business model is high margin relative to installation work. Project-based design fees, retainers with facilities management firms and compliance audit services generate several revenue lines from a lean technical team, with no equipment or inventory to fund.

What sets firms apart

Capability plus process knowledge. Design aligned to NFPA and FM Global standards, BIM integration, and the ability to move a submission through Civil Defence efficiently are all valued, and that last one is itself a service clients will pay for.

Conclusion

Code 7110.93 is a technically regulated, commercially solid license where Civil Defence approval carries as much weight as the trade license itself.

Setup is more involved than a standard license. That is the point worth sitting with: the same friction that slows you down at the start is what keeps the field thin once you are registered and approved.

Get the jurisdiction right, have your engineering credentials attested and current, and the market access is substantial. The pipeline is not speculative, because the law demands the work across every asset class in the emirate.

[blockCTAContact]

References

On-Demand Video
Live Chat
Call Us
WhatsApp