Table of Contents
Frequently Asked Questions
What does activity code 7110.63 cover in Dubai
Activity code 7110.63 is the official classification for Power & Automatic Control Engineering Services in Dubai. It sits within ISIC Division 71, which covers engineering activities and related technical consultancy.
The permitted scope includes engineering design for electrical power distribution systems, SCADA system design, PLC programming consultancy, control panel engineering, automatic control system specification, commissioning oversight, and energy efficiency assessments.
It is important to note that this licence covers consultancy and design-led services only. Physical construction or installation contracting requires a separate contracting licence.
Who are the typical clients for a Power & Automatic Control Engineering Services licence
Firms licensed under activity code 7110.63 typically serve organisations that install or operate power or control infrastructure at scale. Common client categories include:
- Construction contractors
- Industrial facilities
- Utilities and energy providers
- Oil and gas operators
- Real estate developers
Dubai's ongoing infrastructure expansion — including smart grid upgrades and industrial automation projects — creates sustained commercial demand for these services across both public and private sectors.
Can a foreign national own 100% of a Power & Automatic Control Engineering Services company in Dubai
Yes, 100% foreign ownership is available for this type of engineering services business in Dubai. In a Free Zone such as Meydan Free Zone, full foreign ownership is a standard feature of the licence structure.
On the Mainland, UAE regulations now permit 100% foreign ownership in most professional activities, including engineering consultancy, so you are not required to take on a local partner in the majority of cases.
Your choice between Free Zone and Mainland should be driven by your target client base and commercial model rather than ownership concerns alone.
What is the difference between setting up in a Free Zone versus Mainland Dubai for this licence
The key distinction is who you can contract with directly. A Free Zone licence is well suited to consultancy-led models serving private sector, international, or free zone-based clients. Mainland registration is required if you intend to bid for government contracts, work on UAE public infrastructure, or maintain a physical site presence across Dubai.
From a practical standpoint, Free Zone setup is faster — typically five to ten working days — and does not require a physical office beyond a flexi-desk arrangement. Mainland setup generally takes two to four weeks and is regulated by Dubai Economy & Tourism (DET).
If your business model involves both government and private clients, you may need to consider how to structure accordingly, potentially with entities in both jurisdictions.
How long does it take to set up a Power & Automatic Control Engineering Services licence in Dubai
Setup timelines vary by jurisdiction. A Free Zone licence — for example through Meydan Free Zone — can typically be completed in five to ten working days in most cases.
A Mainland licence through Dubai Economy & Tourism generally takes two to four weeks, reflecting additional regulatory steps and approvals involved in that process.
Choosing the right jurisdiction from the outset and ensuring your trade name and documentation are in order will help avoid delays that extend these timelines.
What are the tax obligations for an engineering consultancy licensed under this activity in Dubai
Engineering consultancy fees are standard-rated for VAT at 5% in the UAE, meaning firms providing services under activity code 7110.63 are required to charge and account for VAT once they meet the registration threshold.
For Corporate Tax, the UAE applies a tax on net profits exceeding AED 375,000. Profits below this threshold are not subject to corporate tax, which is relevant for smaller or early-stage engineering consultancies.
It is advisable to engage a qualified UAE tax adviser to ensure correct registration, filing, and compliance from the point of incorporation.
What is the approximate cost of setting up a Power & Automatic Control Engineering Services licence in a Free Zone
Free Zone licence costs for professional engineering services start from approximately AED 12,000 per year, depending on the specific Free Zone authority and the package selected. This figure typically covers the licence fee itself.
Additional costs may include flexi-desk or office space fees, visa allocation costs if you intend to sponsor employees or dependants, and any government or notarisation fees associated with your application documents.
Costs on the Mainland will differ and may include additional regulatory fees payable to Dubai Economy & Tourism. Obtaining a detailed cost breakdown from your chosen Free Zone or a business setup adviser before committing is recommended.
What are the first steps to obtain a Power & Automatic Control Engineering Services licence in Dubai
The process begins with selecting your jurisdiction — Free Zone or Mainland — based on your target client base and commercial model. This decision shapes every subsequent step, including which regulatory body oversees your application.
Once jurisdiction is confirmed, you reserve your trade name by submitting options for approval. Names must comply with UAE naming conventions and must not conflict with existing registered businesses.
Subsequent steps include submitting your licence application with the relevant supporting documents, completing any required approvals, and finalising your office or flexi-desk arrangement. For Free Zone applications, this process can be completed within five to ten working days in most cases.
Power & Automatic Control Engineering Services License in Dubai
Dubai's infrastructure build-out, industrial expansion, and smart city push have created steady, well-paid demand for engineers who design and manage power and automatic control systems. If you are looking to operate in this space, the licensing process is straightforward once you understand what is covered, who you can work with, and which jurisdiction suits your client base.
This guide covers what the license covers, who your clients will be, how to choose the right jurisdiction, and what it takes to get set up and stay compliant.
| License type | Power & Automatic Control Engineering Services |
|---|---|
| Jurisdiction options | Dubai mainland (DET) or free zone (e.g. Meydan Free Zone) |
| Foreign ownership | 100% permitted – Invest in Dubai |
| Typical client base | Real estate developers, utilities, industrial operators, government projects |
| VAT registration threshold | AED 375,000 annual turnover – Federal Tax Authority |
| License renewal | Annual |
What This License Covers
A Power & Automatic Control Engineering Services license covers the design, installation, commissioning, and maintenance of power distribution systems and automatic control infrastructure. In practice, that means you can legally take on work involving SCADA systems, building management systems, industrial automation, and related electrical control engineering.
The license sits within the broader engineering services category. It is a specialist code, so you can operate in both the design-and-consultancy side and the hands-on delivery side of a project. That matters when you are pitching for contracts that run from concept through to commissioning.
What it does not cover:
- General electrical contracting work unrelated to control systems
- Civil or structural engineering activities
- Fire and safety systems engineering, which needs its own separate license
- IT infrastructure or telecoms, even where those systems interface with your control work
If your projects regularly cross into those areas, you will need extra activities added to your license or a separate license altogether. Check the Meydan Free Zone business activities list to confirm which codes can sit together under one license before you apply.
The scope is wide enough to cover most power and automation engineering work in Dubai's construction, industrial, and infrastructure sectors. But be precise when you register your activity code. Vague descriptions create problems during tender pre-qualification, when clients check your license before they let you bid.
Who Your Clients Will Be
Your main clients will be real estate developers, industrial facility operators, utilities, oil and gas companies, and government infrastructure project teams. Each of these groups buys engineering services differently, and understanding that before you set up will save you a lot of wasted effort.
Nobody here buys on a phone call. Developers and utilities run formal procurement processes. They want you on their approved vendor list before a project even goes to tender. Getting on that list takes time: you submit company documents, proof of qualifications, insurance certificates, and often a financial health check. Start that process early, because being licensed is just the entry point.
Government projects add another layer. To work directly on UAE government contracts, you need a mainland license. A free zone license does not give you that access. If your target clients include Dubai Electricity and Water Authority, Roads and Transport Authority, or any federal infrastructure programme, a mainland setup is the right call.
Private sector clients, including large developers and industrial operators, can work with both mainland and free zone companies. So if your pipeline is mostly private-sector or international project work, a free zone license is workable.
Contracts in this sector tend to be a mix of project-based work and retainer maintenance agreements. The maintenance side is worth building into your business model early. Once you have commissioned a system, the client usually wants the same team to maintain it. That creates recurring revenue and makes your pipeline more predictable.
Let your clients decide your jurisdiction, not the setup cost. This is the biggest choice you will make when setting up.
Mainland vs Free Zone: Which Setup Works for You
There are two main routes: a mainland license issued through the Dubai Department of Economy and Tourism (DET), or a free zone license through Meydan Free Zone. Both allow 100% foreign ownership. The differences come down to client access, office requirements, and cost.
| Factor | Mainland (DET) | Free Zone (Meydan Free Zone) |
|---|---|---|
| Client access | Full UAE market, including government contracts | Mainly private sector and international clients |
| Office requirement | Physical office required | Flexi-desk options available |
| Foreign ownership | 100% permitted | 100% permitted |
| Setup cost | Higher, due to office lease and DET fees | Lower starting cost – trade license from AED 12,500 |
| Visa allocation | Tied to office size | Flexible packages available |
| Best suited to | Government project work, large UAE developer contracts | International project work, consultancy, private sector |
A mainland license from DET lets you work directly with UAE government bodies and bid on public tenders without restriction. You will need a physical office, and your visa allocation is tied to the size of that space. The setup costs more upfront, but if your target clients are government departments or large state-linked developers, it pays for itself quickly.
Meydan Free Zone suits founders who are working with private sector clients, running international project work from Dubai, or starting out and want to keep initial costs down. You get 100% foreign ownership, a flexi-desk option instead of a full office lease, and a faster setup process. You can also set up your business remotely without needing to be in Dubai to complete the process.
One thing to be clear about: a free zone company cannot directly bid on UAE government tenders. If that work comes up later, you can either add a mainland branch or restructure. But it is better to plan for this from the start than to retrofit it later.
Free Business Setup Cost Calculator
Calculate NowHow to Set Up: Step-by-Step
- Step 1, book your trade name: Use the DET e-Services portal for a mainland company, or the Meydan Free Zone portal for a free zone one. Check your company name availability before you get too attached to it. Names cannot imply government affiliation or use restricted terms.
- Step 2, confirm your activity code: Make sure the Power & Automatic Control Engineering Services code is approved in your chosen jurisdiction before you go further. Adding activities later is possible but costs extra time and fees.
- Step 3, prepare your documents: You will need passport copies for all shareholders and directors, a no-objection certificate (NOC) if you are currently employed in the UAE, and either a tenancy contract or a flexi-desk agreement depending on your setup.
- Step 4, submit your application and get initial approval: Both DET and Meydan Free Zone issue an initial approval before the license is issued. This is the stage where you confirm your activity, company name, and ownership structure.
- Step 5, pay license fees and collect your trade license: Once fees are paid and documents are verified, your license is issued. Meydan Free Zone can complete this process quickly, often within a few days.
- Step 6, register with relevant engineering bodies if needed: Some government and large-developer contracts need you to be registered with the Dubai Municipality Engineering Department or equivalent authority. Check this requirement against your target client list before you start bidding.
Compliance and What You Need in Place
Getting licensed is the start. Staying compliant is what keeps you trading and winning contracts.
Engineering qualifications
Your staff credentials matter more here than in most service businesses. Clients and procurement teams check qualifications during vendor pre-qualification. Make sure your lead engineers hold recognised certifications relevant to SCADA, building management systems, or industrial automation, depending on your work. Gaps here will cost you tenders.
VAT registration
Once your annual turnover crosses AED 375,000, you must register for VAT with the Federal Tax Authority. Engineering services are standard-rated at 5%. Keep your invoicing and records clean from day one. Retroactive bookkeeping is expensive and messy. Meydan Free Zone's mAccounting service covers VAT registration support if you need help with the process.
MOHRE duties for mainland companies
If you hire staff on the mainland, you have duties under the Ministry of Human Resources and Emiratisation (MOHRE). This covers employment contracts, end-of-service gratuity, and Emiratisation targets once you reach a certain headcount. Free zone companies operate under a different framework, but staff welfare rules still apply.
Annual license renewal
Your license needs renewing every year. Missing the renewal window leads to fines and, if left long enough, license cancellation. A cancelled license affects your visa status, your ability to bid on contracts, and your standing with clients. Set a reminder well before the expiry date and make sure your documents are in order, including your tenancy agreement or flexi-desk contract.
Professional indemnity insurance
Most serious clients in this sector, especially developers and utilities, will ask for professional indemnity insurance before they sign a contract. It is not always a legal requirement, but it is a practical one. Get it in place before you start pitching. The coverage level required varies by client and contract value, so check what your target clients expect before you buy a policy.
Corporate tax
The UAE introduced corporate tax in 2023. Businesses with taxable income above AED 375,000 are subject to a 9% rate. Free zone companies may qualify for a 0% rate on qualifying income, subject to conditions. Check your position with a tax adviser early, and keep your financial records in order from the start. Meydan Free Zone's mAccounting team can help with corporate tax compliance.
Market Opportunity
Dubai's push toward smart infrastructure, energy efficiency, and industrial automation is not slowing down. The emirate's D33 economic agenda targets doubling the size of the economy by 2033, and a significant part of that involves upgrading utilities, transport networks, and industrial facilities. All of that creates demand for power and control engineering services.
The real estate sector alone generates a consistent pipeline. Every new development of scale needs building management systems, power distribution design, and ongoing maintenance. Add the industrial zones, the logistics and port infrastructure managed by operators like DP World, and the government's ongoing investment in public infrastructure, and the demand picture is solid.
Competition exists, but the barrier to entry is real. Clients want licensed companies, qualified engineers, and a track record. That filters out a large part of the market. Once you are on an approved vendor list and have delivered a few projects well, the pipeline tends to build on itself through repeat work and referrals.
Maintenance contracts are the most stable part of the revenue mix. Systems need ongoing monitoring, calibration, and fault response. Clients who trust you with installation will usually want you for maintenance too. Build that into your pricing and your service offering from the start.
Conclusion
Power and automatic control engineering is a regulated, technically demanding field with real long-term contract potential in Dubai. The right license and jurisdiction depend on where your clients sit, not on setup cost alone. If you are targeting government projects or large state-linked developers, go mainland. If your work is private sector or internationally focused, a free zone license through Meydan Free Zone is a workable and cost-effective starting point.
Get your activity code right, your staff credentials in order, and your compliance foundations in place before you start bidding. The procurement processes here are formal, and clients check everything. Being properly set up from day one puts you ahead of competitors who cut corners on licensing.
Talk to Meydan Free Zone about the setup that fits your client base and get a cost estimate before you commit.
Ready to Launch Your Business in Dubai?
Let's Connect
















