Table of Contents
Frequently Asked Questions
What does activity code 7110.65 cover in Dubai
Activity code 7110.65 covers Industrial Production Engineering Services, sitting within ISIC Division 71 — Architectural and Engineering Activities. It encompasses production process design, plant layout planning, manufacturing systems engineering, feasibility studies, production line optimisation, capacity planning, equipment specification, and process flow analysis.
These services are central to how industrial facilities are planned, validated, and improved. Client sectors include oil and gas, food processing, pharmaceuticals, building materials, metals, and utilities — all of which are active and growing in the UAE.
Importantly, this is a professional services and consultancy activity, not a construction or contracting licence. No physical manufacturing is required to hold or operate under this licence.
Where can I licence an Industrial Production Engineering business in Dubai
There are two primary routes for licensing this activity. The first is a mainland licence via Dubai Economy and Tourism (DET), which allows you to contract directly with government bodies and private industrial clients across the UAE without restriction.
The second option is incorporation through a free zone authority such as Meydan Free Zone, which offers 100% foreign ownership, fast incorporation, and competitive setup costs — well suited to a consultancy-model business where work is delivered on-site at client facilities.
One key consideration: free zone entities serving mainland industrial clients may require a commercial agent or a branch office to contract directly, so factor this into your go-to-market structure before committing to a jurisdiction.
What legal structures are available for this type of business in Dubai
The available legal structures depend on the jurisdiction you choose. On the mainland, options include a sole establishment or a Limited Liability Company (LLC). Within a free zone such as Meydan, you can incorporate as a Free Zone Company (FZC or FZCO).
Since activity 7110.65 is classified as a professional activity, no factory or warehouse space is required at the setup stage, giving you flexibility in choosing the most commercially appropriate structure.
What are the steps to set up an Industrial Production Engineering licence in Dubai
The process begins with trade name reservation — check availability and reserve your name via the DET portal or through Meydan Free Zone, ensuring it does not conflict with regulated engineering titles or existing registrations.
Next is initial approval, where you submit your activity selection (7110.65), proposed legal structure, and shareholder documents to the relevant authority for formal approval before incorporation proceeds.
The third step involves office space. Mainland incorporation requires a physical tenancy contract registered through Ejari, while Meydan Free Zone offers flexi-desk options that satisfy the registered address requirement without committing to a full office lease.
Can a foreign national own 100% of an Industrial Production Engineering company in Dubai
Yes. 100% foreign ownership is available through free zone incorporation, such as with Meydan Free Zone. This makes free zone setup an attractive option for international entrepreneurs and engineering consultants entering the UAE market.
On the mainland, ownership structures have evolved under UAE company law reforms, and 100% foreign ownership may also be possible depending on the specific activity and legal structure chosen. It is advisable to confirm current mainland ownership rules with DET or a licensed business setup adviser before proceeding.
What is the significance of Dubai's industrial sector for production engineering businesses
Dubai's manufacturing and industrial sector contributed over AED 36 billion to GDP in 2023, and demand for specialist production engineering services is rising as the UAE advances its industrial strategy toward advanced manufacturing.
The UAE's industrial push — including initiatives aligned with the UAE Make It initiative under the Ministry of Energy and Industry (MOEI) — creates sustained demand for the kind of process design, optimisation, and capacity planning services that fall under activity code 7110.65.
Client sectors such as oil and gas, food processing, pharmaceuticals, and building materials are all active and expanding, providing a broad commercial base for a production engineering consultancy.
Is an Industrial Production Engineering business eligible for visa sponsorship in the UAE
Yes. Businesses licensed under activity code 7110.65 are eligible for both investor and employment visas, allowing the business owner to obtain residency and sponsor staff as the company grows.
The number of visas available is typically linked to the size of your office space and the licence package chosen, particularly within free zones. Flexi-desk packages may carry a lower visa allocation than dedicated office arrangements, so it is worth confirming visa quotas with your chosen authority at the setup stage.
What is the difference between a mainland and free zone licence for this activity
A mainland licence issued by DET allows unrestricted direct contracting with government bodies and private industrial clients anywhere in the UAE. This is particularly important if your target clients are government-linked manufacturers or large industrial operators who require a mainland-registered supplier.
A free zone licence (e.g., through Meydan Free Zone) offers 100% foreign ownership, faster incorporation, and lower setup costs, making it well suited to a consultancy model where engineers work on-site at client facilities rather than from a fixed premises.
The key trade-off is that free zone entities may need a commercial agent or branch office to contract directly with mainland clients, which adds cost and complexity. Your choice of jurisdiction should be driven by where your clients are registered and what contracting requirements they impose.
Start an Industrial Production Engineering Business in Dubai
Dubai's manufacturing and industrial sector contributed over AED 36 billion to GDP in 2023, and the UAE is pushing that number higher through advanced manufacturing. New plants have to be designed, validated and tuned, and the people who do that work are production engineers.
Activity code 7110.65 covers that consultancy. This guide covers what the license permits, where to license it, the setup steps and what the work pays. No factory needed, which is the part most people get wrong about this activity.
Key Stats at a Glance

What This License Covers
Activity code 7110.65 sits in ISIC Division 71, which covers engineering and technical consultancy. The work sits between what a client wants commercially and how the plant actually runs: production process design, plant layout planning and manufacturing systems engineering.
- Feasibility studies
- Production line optimisation
- Capacity planning
- Equipment specification
- Process flow analysis
This is a professional services and consultancy license, not a construction one. You do not need to manufacture anything, and since it is a professional activity, no factory or warehouse space is needed at setup stage. Your clients sit in oil and gas, food processing, pharmaceuticals, building materials, metals and utilities, all of which are active and growing here.
Who Your Clients Will Be
Manufacturing firms, oil and gas operators, construction contractors and government industrial authorities. The work arrives at two points in a plant's life: before commissioning, when the process and layout need designing and validating, and afterwards, when output has to be lifted from an existing line.
Specialisation is what gets you paid properly. A founder with depth in GMP-compliant pharmaceutical production, food safety systems or oil and gas process engineering can charge a premium in a market that checks technical credentials rather than taking a generalist pitch on trust.
Mainland or Free Zone
A mainland license from the Department of Economy and Tourism lets you contract directly with government bodies and private industrial clients across the UAE without restriction. That matters when your targets are government-linked manufacturers or large operators who will only buy from a mainland-registered supplier.
Meydan Free Zone gives you full foreign ownership, a fast setup and lower costs, which suits a consultancy where your engineers work on the client's site rather than from your own premises. The trade-off is that serving mainland industrial clients from a free zone may need a commercial agent or a branch, so settle that before you commit. Let your clients decide it, not the price.
[blockCTACostCalculator]
Step by Step Setup Guide
- Step 1, book your trade name: Check availability through the Department of Economy and Tourism or Meydan Free Zone. The name must not clash with regulated engineering titles or existing registrations.
- Step 2, take initial approval: Submit your activity selection of 7110.65, your proposed legal structure and shareholder documents. This is where the activity gets formally approved before setup proceeds.
- Step 3, sort your office: Mainland needs a physical tenancy contract registered through Ejari. Meydan Free Zone offers flexi-desk options that satisfy the address rule without a full lease.
- Step 4, prepare your qualifications: DET may ask for proof of engineering qualifications or relevant sector experience. Have attested degree certificates and a professional CV ready so this does not hold you up.
- Step 5, sign and collect the license: For an LLC, sign the Memorandum of Association, pay the fees and receive the trade license. Free zone structures follow a similar but usually faster path.
- Step 6, open a corporate bank account: Banks want the trade license, the Memorandum of Association, Emirates ID and evidence of business activity. Allow time for checks, which vary by bank.
- Step 7, apply for visas: Investor visa for the owner first, then employment visas for engineering staff. Your allocation is tied to office space and authority approval.
On timing, free zone setup typically completes in 5 to 10 working days. Mainland runs 2 to 4 weeks depending on approvals and how ready your documents are.
Compliance and What You Need in Place
Professional qualifications
This activity is credentialled. Expect to show engineering qualifications or relevant sector experience, and expect clients to ask for the same. Attested certificates are worth organising before you apply rather than during.
Scope of license
You are licensed to advise, design and analyse, not to build. Keep contracts clear on that, because a client asking you to install what you specified is asking for a different license.
VAT
Register with the Federal Tax Authority once annual turnover passes AED 375,000. Build it into your pricing and invoicing from the start rather than absorbing it later.
Visas and headcount
Investor and employment visas are both available under this activity. Your allocation is usually tied to the size of your office and the license package, so a flexi-desk carries fewer visas than a dedicated office. Confirm quotas with your authority at setup stage if you plan to hire engineers quickly.
Staff duties
Normal UAE employment rules apply once you hire: contracts, work permits and Emiratisation duties once headcount reaches the relevant level.
Market Opportunity
Operation 300bn, the UAE industrial strategy led by the Ministry of Industry and Advanced Technology, aims to triple manufacturing GDP to AED 300 billion by 2031. For a production engineering consultant that is a direct pipeline, because new facilities have to be designed, validated and optimised both before and after commissioning.
Demand concentrates around the country's major industrial zones, where clients need process validation, capacity studies and equipment procurement support, all of it inside the scope of 7110.65. Dubai's own industrial contribution of over AED 36 billion in 2023 gives you a local client base before you look further afield.
On pricing, the market supports AED 1,500 to 4,500 per engineering day depending on specialisation, and project retainers are common on larger engagements. That is a business you can start with a laptop and a CV, which is unusual for work priced at that level.
Conclusion
Industrial Production Engineering Services under code 7110.65 is a well-defined professional activity that lines up directly with the UAE's industrial growth agenda. The license is simple to get in either jurisdiction, it needs no heavy capital, and it puts a competent engineering firm in front of a broad base of manufacturing clients.
Three things decide how smoothly this goes: your credentials package ready before you apply, a technical niche rather than a generalist pitch, and a jurisdiction that matches where your clients are registered. Sort those and the rest is routine.
[blockCTAContact]


















